MENU

WaterWorks

SERVICES: 

1. Application and installation of water connection/ reconnection/ relocation 

2. Collection of water bills 

3. Isssuance of Certifications

4. Water Scheduling 

WATER SCHEDULING  TIME  LOCATION OF TRANSACTION
(Closed & Open Gate Valves) *8 AM - 4 PM SINGSON'S GATE VALVES
  First Shift PATTIG GATE VALVES
  CAPITOL GATE VALVES
  TARNATE'S GATE VALVES
  JUMBO BRIDGE GATE VALVES
  MARKET GATE VALVES
  BCS GATE  VALVES  
  LOC-ONG, JUNGLE TOWN, EYEB 
 
  PATTIG GATE VALVES
  OMFEG GATE VALVES
  CHICO GATE VALVES
  UPPER CALUTTIT  
  LOWER CALUTTIT  
  CURAMED  
  Second Shift *4 PM - 12 MDN PATTIG GATE VALVE 6
  OMFEG GATE VALVE  
  CHICO GATE VALVE  
  POLICE OUTPOST GATE VALVE
  UPPER CALUTTIT  
  LOWER CALUTTIT  
  CURAMED  
  Third Shift *12 MDN - 8 AM PATTIG GATE VALVE  
  CHICO GATE VALVE